Item added to your cart
Troy Lee Designs
Troy Lee Designs Flowline MTB Helmet - Point - White-Black
Troy Lee Designs Flowline MTB Helmet - Point - White-Black
4 interest-free payments of $30 with Affirm. Check your purchasing power
Product ID: GM031325-173
Only 1 Items Left
Shop all Troy Lee Designs | Shop all MTB Helmets
View full detailsDescription
Troy Lee Designs Flowline MTB Helmet
The Troy Lee Designs Flowline MTB Helmet delivers top-tier protection, comfort, and ventilation in a sleek, minimalist design—all at an affordable price. Engineered with Mips® B-Series Rotational Impact Protection, a full 360-degree fit retention system, and extended coverage, this helmet ensures premium safety and all-day comfort for trail riders.
Key Features
- Mips® B-Series Protection – Reduces rotational forces in the event of a crash.
- 3-Way Adjustable Screwless Visor – Easy customization for sun and debris protection.
- Full 360° Fit Retention System – Secure, comfortable, and adjustable fit.
- 14 Vents – Maximized airflow to keep you cool.
- Full Wrap In-Mold Construction – Lightweight yet highly protective shell.
- Extended Coverage – Increased protection for trail riding.
- Side Strap Adjusters – Quick and easy fit adjustments.
With a Five-Star Safety Rating from Virginia Tech, the Flowline MTB Helmet is built for riders who demand reliable performance, comfort, and protection—without breaking the bank.
You Might Also Like
You Might Also Like
- Bell Spark 2 MIPS MTB Helmet - Matt Red Bell$89.95
- 7 iDP Project 21 Trail MTB Helmet - Matt Ice White 7 iDP$149.99
- Giro Source MIPS MTB Helmet - Matt Mineral Giro$129.95
- Bell Falcon XR MIPS MTB Helmet - Matt Tour Green Bell$119.95
- Bell 4Forty MIPS MTB Helmet - Matt Gloss Black-Camo Bell$109.95★★★★★9 review(s)
- Giro Fixture MIPS II MTB Helmet - Youth - Matt Bright Green Giro$74.95
- Kali Protectives Chakra MTB Helmet - Youth Plus - Zwiggles Matte Teal-White Kali20% off$39.99$49.99★★★★★1 review(s)
- Bell Spark 2 MIPS MTB Helmet - Matt Dark Blue Bell$89.95
- Bell Sixer MIPS MTB Helmet - Matt Gloss Black-Gold Bell47% off$89.99$170.00★★★★★6 review(s)
- Bell Spark 2 MIPS MTB Helmet - Matt Black Bell$89.95
- POC Kortal Race MIPS MTB Helmet - Uranium Black Matt-Hydrogen White POC$280.00★★★★★1 review(s)
- Bell 4Forty Air MIPS MTB Helmet - Matt Light Gray-Nimbus Bell40% off$89.99$149.95★★★★★1 review(s)
- Troy Lee Designs Flowline SE MTB Helmet - Badge - Gray-Glo Yellow Troy Lee Designs$159.99★★★★★1 review(s)
- Bell Nomad 2 MIPS MTB Helmet - Matt Dark Blue Bell38% off$39.99$64.95★★★★★1 review(s)
- Smith Session MIPS MTB Helmet - Matt Huckleberry-Lichen-Pacific Smith$170.00★★★★★2 review(s)
- Troy Lee Designs Flowline MTB Helmet - Youth - Point - Caper-Chalk Troy Lee Designs$89.99
- Fox Racing Speedframe Pro MTB Helmet - Blocked - Seafoam Fox Racing33% off$119.99$179.95
- 6D Helmets ATB-2T Ascent Trail MTB Helmet - Matt Hi Viz Yellow 6D Helmets15% off$169.95$199.95★★★★★3 review(s)
- Abus MountZ MTB Helmet - Youth - Velvet Black Abus38% off$49.99$79.99
- Fox Racing Dropframe Pro MTB Helmet - Runn - Black Camo Fox Racing$279.95